Description
Improves material recovery when you cancel a building order, reducing the loss from changing construction plans. Reduces fuel construction costs. Reduces strategic material construction costs. Reduces credit upkeep. Increases rare mineral production. Increases trade income. Reduces common mineral construction costs. Reduces rare mineral construction costs. Increases common mineral production. Recovers more materials from cancelled building orders.
Benefits
Common minerals cost Empire-wideRead the guide-0.95%
Rare minerals cost Empire-wideRead the guide-0.95%
Fuel cost Empire-wideRead the guideChanges fuel paid for eligible construction, not fleet fuel burn.-1.43%
Strategic materials cost Empire-wideRead the guide-0.95%
Credits upkeep Empire-wideRead the guide-0.48%
Common minerals output Empire-wideRead the guide+0.48%
Rare minerals output Empire-wideRead the guide+0.48%
Trade capacity Empire-wideRead the guide+0.29%
Building material refund percentage points Empire-wideRead the guide+10%
Strategy notes
Research this when building costs, construction speed or housing limit your expansion.
Player hints
Cancelling a paid building order returns more of its construction materials. This does not recover battle debris or completed buildings.
Research cost
Prerequisites
The thresholds below refer to progress in each prerequisite. Revealing adds this technology to your research list; researching lets you assign research points. Meet every prerequisite's threshold for each step.
T1 Basic Infrastructure Revealing: 25% Researching: 100%T1 Basic Material Handling Revealing: 25% Researching: 100%T1 Modular Construction Revealing: 25% Researching: 100%Leads to
The thresholds below refer to progress in this technology. Revealing or researching a later technology also requires meeting the relevant thresholds in its other prerequisites.
T1 Nano Fabrication Revealing: 25% Researching: 100%T1 Urban Planning Revealing: 25% Researching: 100%T4 Recovered-Material Shipbuilding Revealing: 25% Researching: 100%T5 Adaptive High-Energy Production Centres Revealing: 25% Researching: 100%Advanced details
Material recovery from cancelled building orders is capped at 75%. Credits, fuel and ship-order refunds remain 50%.