Strategic Empires

Reconnecting Unable to reconnect Session paused Unable to resume session

Restoring your connection to the game.

Trying again in s.

Attempt of .

Check your connection and try again.

Resume when you’re ready to play.

Try again to return to the game.

Strategic reference

Technology

Explore technology map
806 of 806 entries
Modular Construction
T1 Construction

Modular Construction

Industrial Megastructure Empire

Show on map

Description

Modular Construction Technology revolutionizes building practices by introducing pre-fabricated modules that can be assembled quickly and efficiently on-site. This approach significantly reduces construction time, lowers costs, and allows for greater flexibility in architectural design, making it easier to expand or modify structures as your empire grows.

Benefits

  • Credits cost Empire-wide
    -0.99%
  • Common minerals cost Empire-wide
    -0.84%
  • Rare minerals cost Empire-wide
    -0.74%
  • Fuel cost Empire-wide
    -0.5%
  • Strategic materials cost Empire-wide
    -0.99%
  • Trade capacity Empire-wide
    +0.2%
  • Construction output Empire-wide
    +1.24%
  • Ship production Empire-wide
    +0.5%

Strategy notes

Modular Construction develops the Construction discipline within Industrial Megastructure Empire. Concentrate minerals, automation, and orbital capacity into unmatched construction throughput and system-scale works. Its immediate value is -5% Rare Minerals Cost; Medium Housing; +20% Production. The principal counterpressure is that its fixed yards, long supply chains, and visible projects are vulnerable to blockade and sabotage. This milestone deliberately joins completed material, industrial, or colony infrastructure research.

Player hints

This is an inexpensive path entry. Research it early when you want to test this direction without sacrificing strategic flexibility. Favor this technology when its Construction benefits reinforce your current economy, fleets, or frontier. Pause the branch if its expected RP per tick is too diluted or its resource costs would stall higher-priority projects. Every Construction prerequisite must be completed before research can begin.

Research cost

1.65KRP 1.24KCredits 618Common 165Rare 103Strategic 82Fuel
An unhandled error has occurred. Reload 🗙